Opponering på Projektplan
Description of issue:
Jacob reviews their document and Arvid verifies it.
Linked Requirements:( Y )
Potential Issues:X
Blockers:( #X )
Issue Requirements:- X
X
Description of issue:
Jacob reviews their document and Arvid verifies it.
Linked Requirements:( Y )
Potential Issues:X
Blockers:( #X )
Issue Requirements:X
added 1 deleted label
added 1 deleted label
changed time estimate to 5h
changed the description
added Blocker label
changed the description
I have reviewed their document found in the drive. I have left a lot of comments and made a summary in the summary document.
I have reviewed your review of their document. Great with alot of comments. Can you add to the summary something good about their document?
added 1h of time spent at 2020-03-24
changed milestone to %Sprint 2
added 30m of time spent at 2020-03-27
closed
removed 1 deleted label