Reorder operations in scheduler
Restart from top with current schedule.
Also possible to drag in y-direction and "insert" operation between two operations leading to that the operations above/below are reordered.
Probably a first step is to introduce a high-level y-position for each operation. This should then be saved in the schedule and fed back to the figure generation.
One may also consider allowing multiple operations on the same line.
Edited by Oscar Gustafsson